Caliber
Engineering Consultants LLC
750 Executive Center Drive, Suite 100 (29615)
P.O. Box 27171 | Greenville, South Carolina | 29616-7171
P: 864.244.9238 | F: 864.244.9576 | M: 864.430.6034
More than 22 years
of consulting engineering experience including feasibility and
preliminary engineering studies, final design and permitting, bidding
and construction phase services, and project management services for
public and private clients throughout the Southeast.
PROFESSIONAL
REGISTRATION
South
Carolina, North Carolina, Tennessee, Georgia, Florida, & Puerto
Rico
WATER
SUPPLY, TREATMENT AND DISTRIBUTION
-
North Saluda Reservoir Outlet Structure
Concrete Repairs - Greenville Water System, SC
-
Miscellaneous pump stations, pipelines, and
storage reservoirs - Greenville Water System, SC
-
Intake and water treatment plant expansions
and pipelines - Greenwood (SC) CPW
-
North Tyger River dam and reservoir - Startex
Jackson Wellford Duncan (SC) Water District
-
Blalock Dam rehabilitation, SC Highway 9
pipeline & pump station - Spar-tanburg (SC) Water System
WASTEWATER
COLLECTION AND TREATMENT
-
SSES and Rehab/Replacement Sewer Design –
Cities of Greenville, Mauldin, and Fountain Inn
-
18 Mile Creek Upper Regional Wastewater
Treatment Plant & Interceptors - Pickens County PSC, SC
-
On-site Wastewater Treatment and Disposal --
Alta Vista Resort (Paris Mtn.)
-
On-site Wastewater Treatment and Disposal –
Altamont Forest (Paris Mtn.)
-
New South Central Middle School, School
District of Greenville Co., Design of on-site wastewater systems.
Application of new irrigation technologies in treated sewage disposal.
-
Sanders Crossing Subdivision, NC –
Rehabilitation of on-site septic system.
-
Metro Wastewater Treatment Plant headworks
rehabilitation & equalization analysis - City of Columbia, SC
-
Saluda Wastewater Treatment Plant aeration;
Reedy River 54” trunk sewer - Western Carolina Regional Sewer
Authority, Greenville, SC
STORMWATER
-
Hydrology/Hydraulics
-
Hydraulic Structures/Detention Ponds
-
Reservoir Yield Analysis
-
Sediment and Erosion Control Design &
BMPs
-
Open-channel and piped collection systems
Design
-
Site Layout, Grading and Drainage
-
State/County Permits
-
HEC-RAS Modeling
MUNICIPAL
SOLID WASTE LANDFILLS
-
Environmental studies, landfill design,
permitting, closure, groundwater as-sessment, stormwater design and
permitting - Pickens County, SC - Easley Landfill
-
Closure design and construction, groundwater
& LFG assessments - Pickens County, SC – Clemson-Central
Landfill
-
Environmental studies, design, closure,
groundwater & LFG assessments, stormwater permitting - Union
County, SC – Union County Landfill
-
Feasibility, siting, intergovernmental
relations, privatization, FIN Process - Union County, SC – New Union
County Regional Landfill
-
Mauldin Road landfill studies, municipal
solid waste management studies - City of Greenville , SC
LAND
DEVELOPMENT / SITE DESIGN
Site
design, permitting, and construction services for schools, churches,
office developments, industrial facilities, various low-rise office
buildings, and shop-ping centers (see Firm Selected Project History).
EDUCATION
Bachelor
of Civil Engineering
Georgia Institute of Technology, 1983
PROFESSIONAL
ASSOCIATIONS
National
Society of Professional Engineers
American Society of Civil Engineers
American Water Works Association
Water Environment Federation
Water Environment Association of South
Carolina
SPECIALTY
CERTIFICATION
SWANA
Manager of Landfill Operations (MOLO)
|