Caliber
Engineering Consultants LLC
750 Executive Center Drive, Suite 100 (29615)
P.O. Box 27171 | Greenville, South Carolina | 29616-7171
P: 864.244.9238 | F: 864.244.9576
Joe Cunningham has
over 30 years of engineering design and water utility management
experience in South Carolina and the Southeast. Has provided civil
engineering oversight and design and managed capital projects through
construction.
PROFESSIONAL
REGISTRATION
South
Carolina and Georgia
WATER
SUPPLY, TREATMENT AND DISTRIBUTION
-
22.5 MGD conventional water treatment plant
design and construction.
-
42-inch water transmission main extension.
-
Upgrade 64.5 MGD plant capacity through water
modeling the plant discharge re-piping project.
-
Investigation of reservoir dam safety and
spillway.
-
Upgrade existing plant filtration bottom from
Copper laterals to Leopold High rate system.
-
24 and 36-inch water line relocation work.
-
Elevated storage tank removal through system
modeling.
-
80 MGD bypass pumping, new chlorine system
and SCADA instrumentation.
-
Design of multiple well, chemical addition,
and water distribution system.
-
Countywide water system Master plan for
development and land use.
-
Countywide groundwater system master plan.
Ground water system withdrawal permits.
-
Design a 750,000-gallon composite tank, 1700
GPM deep well, chemical addition.
STORMWATER
MANAGEMENT
-
Expert witness before State Legislative
Committee on storm water regulations for construction site activities,
- Atlanta, GA
-
Engineering representative and lecturer on
state NPDES task force for storm water pollution prevention , Georgia
Tech Research Inst., Atlanta, GA
-
Development of storm water pollution plans
(SW3P) for 17 industrial plants and a municipal landfill
-
Preparation of SW3Ps for 5 power plants, 4
operations centers, and 80 ser-vice centers - Florida Power and Light,
West Palm Beach, FL
WASTEWATER
COLLECTION AND TREATMENT
-
60-inch gravity sewer system.
-
City master plan
for water and sewer development.
-
Countywide water
system Master plan for development and land use.
-
Countywide
groundwater system Master plan.
-
Spray irrigation
using land treatment.
-
Design of package
treatment facility for private developer.
-
Design of an 18 MGD
water plant residuals plate and frame system.
-
Design of a
residuals handling lagoon system.
-
Design a retrofit
for sedimentation basin residuals removal system.
-
Design of multiple
gravity collection systems.
-
Design of various
sizes of pump stations and force mains.
-
System wide pump
station rehabilitation project consisting of 25 lift stations.
EDUCATION
BS
- Civil Engineering, 1975
Clemson University
PROFESSIONAL
ASSOCIATIONS
American
Water Works Association
Water Environment Federation
Water Environment Association of South
Carolina
|